Leave the price at 0 to see the typical installed range for the material you picked.
Roof shape, underlayment, ice barrier and nailingGable or hip, synthetic or felt, cold climate, high wind and measured edges
Leave a box at 0 and the calculator works that edge out from the footprint, pitch and roof shape.
See full breakdown
To size a roof, multiply the footprint (length × width, overhang included) by the pitch multiplier, which is 1.118 for a 6/12 roof, then divide by 100 to get roofing squares. Add 10% waste for a simple gable, 15% when there are some valleys and 20% for a hip roof with dormers. Most shingles come 3 bundles to the square, so a 2,000 sq ft roof is 20 squares, or 66 bundles with 10% waste. Installed asphalt shingles run about $3.40 to $5.95 per sq ft.
How to calculate roof square footage
How this roofing calculator works: footprint first, then pitch, then waste, then squares. The roof square footage calculator tab stops at squares and bundles, and the material tab carries on until the supplier order is complete.
| Roof area and squares homeowners | Material order list roofers | |
|---|---|---|
| Footprint | Length × width, with the eaves overhang added on all four sides | The same footprint, plus eave, rake, ridge, hip and valley lengths from the roof shape or your own tape |
| Roof area | Footprint × pitch multiplier, worked out as √(1 + (rise ÷ 12)²) | The same, done one plane at a time when the roof has more than one pitch |
| Waste | 10%, 15% or 20%, depending on how cut up the roof is | Added to the roof area before a single bundle or roll is counted |
| Final number | Roof area × (1 + waste) ÷ 100 = squares to order | Squares × bundles per square, edge feet ÷ length per piece, order area ÷ coverage per roll |
Worked example: a 40 × 30 ft house with a gable roof, 1 ft overhang, 6/12 pitch and few cuts
When to use this roofing calculator
Any time a roof project needs a real size before money changes hands, whether you are comparing materials, lining up financing or ordering shingles.
- Before you collect quotes: roofers price by the square, so the square count is the first line to check on any bid. Measure the house, set the pitch, and a quote that counts far more squares than your roof actually has will stand out right away.
- Home purchase inspections: size an aging roof so a replacement can be priced into the offer.
- Insurance claims: after a storm, measure the damaged slopes and put your own squares next to the adjuster's scope. Keep the 25% rule in mind, because in many areas repairing more than a quarter of a roof inside 12 months triggers a full replacement.
- Upgrading materials: asphalt, metal, tile, shake or slate on the same roof area, side by side.
- Budget forecasting: landlords and property managers can size every roof in a portfolio once and plan replacements years ahead. Squares stay the same from one quote cycle to the next, which makes the numbers easy to carry into a capital plan.
- Ordering materials: roofers can use the Material order list tab as a shingle calculator and a full takeoff in one, covering bundles, starter, drip edge, ridge cap, underlayment, ice and water shield and nails.
- Financing a new roof: walk into a lender or a financing quote with a roof size you trust.
- Supplier takeoffs: counter staff can turn a customer's footprint and pitch into bundles and rolls without waiting for a measurement report.
Roof pitch multiplier chart
A sloped roof covers more surface than the ground under it. Multiply the flat footprint by the factor for your pitch to get the true roof area.
| Pitch | Angle | Multiplier | Extra area | A 2,000 sq ft footprint becomes |
|---|---|---|---|---|
| 2/12 | 9.5° | 1.014 | +1.4% | 2,028 sq ft |
| 3/12 | 14.0° | 1.031 | +3.1% | 2,062 sq ft |
| 4/12 | 18.4° | 1.054 | +5.4% | 2,108 sq ft |
| 5/12 | 22.6° | 1.083 | +8.3% | 2,166 sq ft |
| 6/12 | 26.6° | 1.118 | +11.8% | 2,236 sq ft |
| 7/12 | 30.3° | 1.158 | +15.8% | 2,316 sq ft |
| 8/12 | 33.7° | 1.202 | +20.2% | 2,404 sq ft |
| 9/12 | 36.9° | 1.250 | +25.0% | 2,500 sq ft |
| 10/12 | 39.8° | 1.302 | +30.2% | 2,604 sq ft |
| 11/12 | 42.5° | 1.357 | +35.7% | 2,714 sq ft |
| 12/12 | 45.0° | 1.414 | +41.4% | 2,828 sq ft |
Most houses sit between 4/12 and 9/12. To find yours, hold a level 12 inches out from the roof surface and measure the drop at the end: that drop in inches is the rise.
How much waste should you add to a roof order?
Every valley, hip and dormer means angled cuts, and angled cuts mean offcuts you cannot reuse. Pick the waste by how cut up the roof is.
| Roof | Waste | What it looks like | Order area for 2,000 sq ft of roof |
|---|---|---|---|
| Simple | 10% | A clean gable with few cuts and no major valleys | 2,200 sq ft |
| Medium | 15% | Some valleys and an average number of cuts. A safe pick for most reroofs when you are unsure. | 2,300 sq ft |
| Complex | 20% | Hip roof with dormers, skylights and several valleys | 2,400 sq ft |
How many bundles, rolls and pieces does a roof need?
Shingles are counted from the order area. Starter, drip edge and ridge cap are counted from edge length, which is why a long, narrow house needs more of them than a square one with the same roof area.
| Material | Sold as | Coverage | How to count it |
|---|---|---|---|
| Shingles | Bundles | 3 to 5 bundles a square | Squares to order × the bundles per square printed on the wrapper |
| Starter strip | Bundles | 100 linear ft | Eaves + rakes ÷ 100 |
| Drip edge | Pieces | 10 ft each | Eaves + rakes ÷ 10 |
| Ridge cap | Bundles | 20 linear ft | Hips + ridges ÷ 20 |
| Synthetic underlayment | Rolls | 1,000 sq ft (10 squares) | Order area ÷ 1,000, doubled from 2/12 to 4/12 |
| #15 felt | Rolls | 400 sq ft (4 squares) | Order area ÷ 400 |
| Ice and water shield | 36 in rolls | 66 linear ft | Eave length × rows needed to reach 24 in inside the wall, plus valleys, ÷ 66 |
| Nails | Coils or boxes | About 400 a square | Four nails a shingle, six in high wind areas. A box holds about 7,200. |
Woven valleys eat about one extra bundle for every 16 ft of valley. Pipe boots, step flashing, wall flashing and chimney or skylight flashing depend on what is on the roof, so count those on site.
How big is the roof on my house?
On a simple roof between 4/12 and 8/12, the roof is about 5% to 20% bigger than the footprint. Here is what that means in squares and bundles before you open the roof square footage calculator.
| Footprint | Roof area | Squares | Bundles with 10% waste |
|---|---|---|---|
| 1,000 sq ft | 1,050 to 1,200 sq ft | 10.5 to 12 | 35 to 40 |
| 1,500 sq ft | 1,575 to 1,800 sq ft | 15.75 to 18 | 52 to 60 |
| 2,000 sq ft | 2,100 to 2,400 sq ft | 21 to 24 | 70 to 80 |
| 2,500 sq ft | 2,625 to 3,000 sq ft | 26.25 to 30 | 87 to 99 |
Bundles assume 3 per square. On a two story house, use the area the house covers on the ground, not the living space, since the second floor sits under the same roof.
What does a new roof cost per square foot?
Once you know the roof area, the material sets the price. These are installed prices per sq ft of roof, plus what removing the old layer usually adds.
| Material | Installed, per sq ft | On a 1,700 sq ft roof | Tear off, per sq ft |
|---|---|---|---|
| Asphalt shingles | $3.40 to $5.95 | $5,840 to $10,100 | $0.39 to $0.53 |
| Metal | $6.00 to $24.50 | $10,245 to $41,640 | Varies |
| Tile | $6.30 to $12.30 | $10,665 to $20,900 | $1.45 to $1.97 |
| Wood shakes | $6.00 to $9.15 | $10,230 to $15,500 | $0.50 to $0.68 |
| Slate | $23.49 to $31.77 | $39,925 to $54,020 | $1.21 to $1.63 |
How do roofers measure a roof and build the order?
A clean order comes from the same six steps on every job, and skipping one is how a crew ends up driving back to the supply house at noon.
- Get the footprint or a reportTape the walls, or pull the area from a satellite or drone report.
- Read the pitch on every planeA porch at 3/12 and a main roof at 8/12 need separate multipliers. Measure each section on its own and add them together, because one average pitch hides the difference.
- Measure the edgesEaves, rakes, ridges, hips and valleys in linear feet.
- Set the waste10% on a clean gable, 15% with some valleys, 20% once hips, dormers and skylights come in. Premium shingles with offcuts you cannot reuse deserve the higher end.
- Count the orderBundles from the order area, accessories from the edges, rolls from the area again.
- Walk the verify listPipe boots, step and wall flashing, chimney and skylight kits. None of them show up in a square count, and decking condition only shows once the old roof is off.
The Material order list tab in the calculator runs these counts for you.
After a hailstorm, half the street calls a roofer on the same afternoon.
Whoever answers first gets the inspection. A call that rings out while your crew is up on a tear off tends to book with the next roofer on the list. ServiceAgent is on the line for every ring, nights and weekends included. It collects the address and what the storm did, puts the inspection on your calendar and texts the homeowner a confirmation.
Book a free demoFrequently asked questions
Measuring a roof, counting shingles and pricing the result, answered briefly.
Book a free demoHow do I calculate how much roofing I need?
Multiply the length and width of the house, with the overhang added on every side, to get the footprint. Multiply that by the pitch multiplier (1.118 for a 6/12 roof) to get the roof area, add 10% to 20% for waste, and divide by 100. The answer is the number of roofing squares to order.
How many bundles of shingles for a 2,000 sq ft roof?
A 2,000 sq ft roof is 20 squares. At 3 bundles per square that is 60 bundles, or 66 once you add 10% waste for a simple gable. A cut up hip roof at 20% waste needs 72. Heavier shingles packed 4 or 5 bundles to the square need more, so check the wrapper.
What is the 25% rule for roofing?
In many areas, if more than 25% of a roof, or of one roof section, is repaired within 12 months, the repair is treated as a replacement and that roof has to be brought up to current code. Not every jurisdiction uses it, so ask your local building department before you plan a partial job around it.
How much should a 1,000 sq ft roof cost?
Installed asphalt shingles run about $3.40 to $5.95 per sq ft, so 1,000 sq ft of roof comes to roughly $3,400 to $5,950. Tile runs $6.30 to $12.30 per sq ft and metal $6.00 to $24.50, so the same roof costs far more in those materials.
What is a roofing square?
A roofing square is 100 sq ft of roof surface. Shingles, underlayment and labor are all priced and ordered by the square, so a 2,400 sq ft roof is 24 squares.
How accurate is this roofing calculator?
For a gable or hip roof with one pitch, the area is as good as your tape measure. L shaped houses, dormers, porches and mixed pitches are where estimates drift, so measure each section on its own and add the results. Roofers should still walk the roof before the order goes in.
Can I use it for commercial or flat roofs?
Yes for pitched sections of any building, residential or commercial: enter the footprint or the measured roof area. Any section flatter than 2/12 cannot take asphalt shingles and needs a membrane system, so size those parts with the flat roof calculator instead.
Does the estimate include tear off, taxes or permits?
No. The price line is your price per sq ft times the roof area, before tax and permits. Tearing off old asphalt shingles adds about $0.39 to $0.53 per sq ft, and roughly 60% of a typical replacement bill is labor rather than materials.
Can I use my own supplier's prices?
Yes. Enter your own price per sq ft in the Roof area and squares tab and the calculator multiplies it by the roof area. Roofers can also set the bundles per square and underlayment type to match what their supplier stocks.
Does it work for roof repairs as well as replacements?
Yes. Measure only the section you are fixing to get its squares and bundles. For what the repair itself costs, the roof repair cost calculator covers leaks, flashing and shingle replacement.
Is this roofing calculator useful for roofing contractors?
Yes. The Material order list tab gives a roofer the supplier takeoff in one pass, and the squares drop straight into a customer proposal. When the job is finished, the roofing invoice template turns the same line items into a bill.
Leads growth and product marketing for ServiceAgent at SaaS Labs, where he has worked in product marketing since 2020. Writes ServiceAgent's coverage of AI call answering, CRM and home services operations.
GAF Master Elite installer with 16 years in residential and commercial roofing. Former operations lead at Beldon Roofing, now reviews ServiceAgent roofing content.
Published by ServiceAgent, the AI front office for home service teams. Roof areas and material counts are planning estimates. Measure each roof section on site, check the coverage printed on the product wrapper, and ask for a written quote before the crew starts.