Buffers, drive time and double-booking checks
Protect drive time with buffers and stop double-booking.
Read the lesson
Goal: Set buffers and notice rules so the calendar only offers times the crew can really make. Then prove there is no double-booking.
You need: The services and real durations from lesson 1. Access to Calendar Configurations and Jobs. Each tech's Google Calendar, if they use one.
Why this matters
A calendar that books jobs back to back looks efficient. It is not. The tech finishes at 10:00 and the next job starts at 10:00, 15 minutes away. They are late to every job after the first. By 3 pm, they are an hour behind, and the last customer cancels.
Late arrivals cost reviews, overtime and cancelled jobs. The fix is not "drive faster". The fix is a calendar that knows travel takes time.
ServiceAgent has no travel-time setting. You use buffers instead. A buffer is empty time the calendar keeps between jobs. Set it to the usual drive time, and the calendar stops offering impossible slots.
The settings that shape free time
| Setting | Where | What it does |
|---|---|---|
Buffer Between Appointments (minutes) | Booking calendar Booking Rules | Gap after every job on that calendar |
Buffer Before / Buffer After | On one appointment | Extra gap for one job |
Minimum Notice (hours) | Booking Rules | How soon a customer can book |
Maximum Advance (days) | Booking Rules | How far ahead a customer can book |
Allow Rescheduling / Allow Cancellation | Booking Rules | Whether customers can change bookings |
Block Time | Jobs | Time off or a break for one staff member |
Block Google busy times | Each member's Google Calendar connection | Personal events block work time |
Hide Buffers in Jobs only hides buffers from view. They still work.
ServiceAgent does not connect to Outlook calendars today. Google Calendar is set per team member.
Which setting fixes the slot?
- A slot on the calendar looks wrong
- Do techs run late between jobs?YesRaise Buffer Between AppointmentsNoCheck the next symptom
- Are the next days empty online?YesLower Minimum Notice (hours)NoCheck the next symptom
- Do personal plans clash with jobs?YesBlock Google busy times, or Block TimeNoOne long job: Buffer After on it
- Book a test job as a customer
Choosing the numbers
Buffer. Use the usual drive between jobs in the service area. Ask the techs, not the owner. A dense city route might need 15 minutes. A rural area might need 30.
Minimum notice. Long enough for the office to plan, short enough to win urgent work. Many trades use 2 to 24 hours. A 72-hour minimum hides three days of open slots.
Maximum advance. Long enough for planned work, short enough that the schedule stays real. 30 to 60 days suits most trades. Seasonal work, such as fall cleanups, may need more.
Booking Rules on the booking calendar
Booking Rules
Build it in ServiceAgent
- Ask the techs how long the usual drive between jobs is. Use their number.
- Go to
Settings→Service Catalog→Booking rules. This opensCalendar Configurations. - Edit the booking calendar. Set
Buffer Between Appointments (minutes)to the drive time. - Set
Minimum Notice (hours)andMaximum Advance (days)with the owner. - Decide
Allow ReschedulingandAllow Cancellationwith the owner. - For one long or far job, use
Buffer BeforeorBuffer Afteron that appointment. - Ask each tech who uses Google Calendar to connect it and turn on
Block Google busy times. - Test the sync both ways. Add a test event in the tech's Google Calendar and check it blocks time. Book a test job and check it appears in their Google Calendar.
- Test double-booking. Book a slot from one phone. Then try the same slot from a second phone. The second phone must not see it.
- Use
Block Timefor planned time off, withTime OfforBreak. - Look at one full test day in
Jobs. Count how many jobs fit. Compare with what the techs say they can do.
Check it works: the second phone cannot book the taken slot. A tech's personal event blocks their time. One test day matches what the techs can really do.
Double-booking test
- Book a slot from phone 1
- Try the same slot from phone 2: it must not show
- Add a test event in a tech's Google Calendar
- Check it blocks their time
- Book a test job and check their Google Calendar
How business size changes the rules
An owner-operator often works alone across a wide area. Their buffer may need to be longer, and their Minimum Notice short, so urgent work can still book. A fleet usually covers zones, so drive times are shorter and steadier. Set one booking calendar per zone if drive times differ a lot. A multi-location business needs its own rules per location. A city branch and a rural branch should not share a 15-minute buffer.
Long jobs need extra care. A 4-hour install followed by a service call can still run late. Add a Buffer After on that one appointment, instead of raising the buffer for every job.
Watch the result
After two weeks, ask the techs one question. "Are you on time?" Then check Analytics → Appointments for Cancellations. Late arrivals often show up as late cancellations. If techs still run late, raise the buffer by 5 minutes and check again.
Worked example: Northside Plumbing
Northside Plumbing has 8 techs on Core. Owner Carol. Drain jobs take 60 minutes. The next home is usually 15 minutes away. Techs work 8:00 am to 4:30 pm. That is 510 minutes.
Without a buffer, the calendar fits 8 drain jobs: 8 x 60 = 480 minutes, ending at 4:00 pm. In real life, each of the 7 drives adds 15 minutes. The day really takes 480 + 7 x 15 = 585 minutes. The tech finishes at 5:45 pm, 75 minutes late. The last customers wait.
Northside's drain day with no buffer
- 8:00 amJob 1 starts, set at 60 minutes
- 9:00 amJob 2's slot starts; the tech is still driving
- 9:15 amTech arrives 15 minutes late
- 4:00 pmThe calendar says the day is done
- 5:45 pmJob 8 ends, 75 minutes past 4:30 pm
With a 15-minute buffer, each job takes 60 minutes plus a 15-minute gap after it, except the last.
- Jobs and gaps: 60 x n + 15 x (n − 1) ≤ 510
- 75n − 15 ≤ 510, so 75n ≤ 525
- n = 7 jobs
- 7 jobs: 420 minutes of work + 90 minutes of buffers = 510 minutes. The day ends at 4:30 pm.
How many drain jobs fit with a buffer
The calendar now offers 7 drain jobs per tech, not 8. Carol worries about the lost job. You show them the real choice. Eight jobs on paper means late arrivals, overtime and an angry eighth customer. Seven jobs on time means good reviews and no overtime.
Northside's drain day, before and after
- 8 jobs booked
- Real day: 585 minutes
- Day ends 5:45 pm
- 75 minutes late
- 7 jobs booked
- Real day: 510 minutes
- Day ends 4:30 pm
- On time
Common mistakes
- Looking for a travel-time setting. There is none. Use
Buffer Between Appointments. - Using the owner's guess for drive time. Ask the techs. They drive it every day.
- Minimum notice set too high. It hides days of open slots. Check the page as a customer.
- Testing calendar sync one way only. Test both directions with a test event and a test job.
- Asking the AI to "leave gaps". The calendar rules decide free time, not the AI's instructions.
Do this now
For one roster business, pick a common job length, a drive time and a workday. Work out how many jobs fit with and without a buffer. Write the number of minutes the tech would run late without it.
Practice the conversation
- Owner Buffers mean fewer jobs a day.
- Operator On paper, yes. Your techs tell me drains take an hour, and the next house is 15 minutes away.
- Owner So?
- Operator Without a buffer, the calendar books 8 jobs. The day really ends at 5:45.
- Owner That's overtime.
- Operator And the last customers wait over an hour. With a buffer, 7 jobs fit, and everyone is on time.
- Owner What about personal stuff in the techs' calendars?
- Operator Each tech connects Google Calendar. Their dentist visit blocks their work time.
- Owner And nobody gets double-booked?
- Operator I test it from two phones before we go live.
Quick check
- A plumbing shop's drain jobs take 60 minutes. The next home is usually 15 minutes away. The calendar books jobs back to back, so techs arrive late. What do you set?
- Ask the AI agent to leave a gap after each job when it books
- Use `Block Time` to add a 15-minute break after every job by hand
- Add a travel-time setting to the drain service in `Services`
- Set a 15-minute buffer between appointments on the booking calendar
- A tech works 7:30 am to 4:00 pm. Each tune-up takes 90 minutes, with a 30-minute buffer between jobs. How many tune-ups fit in a day?
- 3
- 4
- 5
- 6
- You connect a tech's Google Calendar. How do you check the sync before go-live?
- Trust the connection screen
- Wait for real bookings, then ask if any clash
- Add a test event and book a test job, then check both directions
- Ask them to copy their personal plans into ServiceAgent
ServiceAgent UniversityLearn to run a service business on autopilot. Free courses, Blueprints and certification for Service Operators.